Project:   The Airplane Factory - Sling TSi   -   VIEW REPORTS
Total Hours:1190.7
Start/Last Date:Dec 01, 2019 - Jan 29, 2023
Engine:Rotax 915is
Panel:Garmin 3X
 
Friendly URL: https://eaabuilderslog.org?s=MattJ

Home or Last Project Picture

Oct 28, 2022     Flaps torque tube - (6 hours)       Category: Controls
Now that the wings are attached it is time to get the flaps and other control surfaces connected. Started with the flaps and worked my way thru the ailerons.


 